Glossary
Term | Definition |
Profit Genie | Budgeting tool that calculates what to charge per day/hour to meet profit goals. |
PMM (Production Minus Materials) | Pricing model that excludes materials to focus on labor, overhead, and profit. |
ISPS | Integrated Sales Psychology & Strategies used to boost conversions through behavioral framing. |
Proposal | A client-facing project estimate containing scope, pricing, and optional packages. |
Takeoffs Page | Starting point for proposals; used to enter job, client, crew, and setup information. |
Landscape Work Areas | Individual zones of a project used to organize sections (e.g., Patio Area, Front Yard). |
Sections | Distinct installable elements in a proposal like Beds, Lawn, Pavers, etc. |
Templates | Pre-built section configurations with reusable materials, labor, and equipment data. |
Custom Sections | User-defined sections not in the system’s default library (e.g., Firepit). |
Custom Groups | Groupings of multiple sections presented with one bundled price in client proposals. |
Mainframe | A strategic Custom Group name for bundling foundational items like Mobilization, Irrigation, etc. |
Proposal Packages | Good/Better/Best tiers used to show structured pricing options via checkbox logic. |
Markup Screen | Financial breakdown screen showing pricing, profit metrics, and PMM alignment. |
Daily PMM | Required daily billing target to cover overhead and meet profit goals. |
Hourly PMM | Hourly target per employee needed to stay profitable. |
Real-Time Pricing Feedback | Dynamic updates to section pricing based on crew, markup, or PMM settings. |
Proposal PMM | Overall PMM value across all sections of a proposal. |
Proposal PMM + Subs and Equip | PMM including subcontractor and equipment costs. |
Gross Profit | Total profit after costs for labor, materials, subs, and equipment are subtracted. |
Gross Profit Margin | Percentage representation of gross profit relative to proposal value. |
Efficiency Calculator | Tool used to model profitability impact of adjusting crew sizes or finishing early. |
Unbillable Labor | Non-revenue time (e.g., travel, loading) factored into Profit Genie and crew rates. |
Hidden Labor Cost | Financial impact of unbillable labor over time. |
Fully Loaded Rate | Labor rate including taxes, insurance, and employer burdens. |
Field Employees | Direct revenue-generating crew members added to proposals and Profit Genie. |
Overhead Employees | Non-field staff like office workers and owners, recovered via labor billing. |
Employer Tax Settings | Tax rates applied to employee pay to calculate fully loaded labor costs. |
Crew Size | Number of employees assigned to a section or job. |
Crew Hours | Billable daily hours of labor excluding unbillable time. |
Labor Summary | Snapshot showing crew size, total hours, and estimated install days per section. |
Man Hours | Combined labor time for a section based on crew size and install duration. |
Materials Catalog | Database of all items with pricing, unit types, install times, and descriptions. |
Install Time | Time needed to install one unit of material; used in crew-hour calculations. |
Unit Type | Measurement used for materials (e.g., Each, Sqft, Yard, Gallon). |
Equipment Catalog | Detailed breakdown of equipment costs and usage-based billing rates. |
Fuel Prices | Input settings used to calculate equipment operating costs. |
Subcontractor Catalog | Contact info and service rates for subcontractors added to proposals. |
Client Catalog | Stored client details including name, address, and communication history. |
Annual Overhead | Full yearly operating expense used to calculate PMM targets. |
Overhead Expenses | Fixed monthly costs (insurance, rent, phones) entered for budget planning. |
Miscellaneous Expense | Suggested 5–10% buffer for unexpected spending. |
Proposal Statuses | Stages of a proposal: Draft, Sent, Viewed, Accepted, Rejected. |
Crew Notes | Internal instructions visible only to crews (e.g., staging, access notes). |
Description of Services | Client-facing explanation of work performed for each section. |
Project Overhead | Non-labor project costs such as travel, rentals, or port-a-potty fees. |
Mobilization | Client-facing renaming of Project Overhead to emphasize logistics and coordination. |
Contract for Services | Proposal payment terms including down payment and progress schedule. |
Client Accept | Signature event that locks in proposal terms and initiates project workflow. |
Change Order | Structured proposal update post-acceptance for scope or pricing changes. |
Update Package Feature | Post-sale upgrade tool allowing clients to select a different package with automated pricing. |
Project Folder | Location for files, images, and documents tied to active projects. |
Project Budget Page | Tracks material ordering and delivery status by section. |
Vendor | Supplier selected when logging material orders. |
Smart Calendar | Live scheduling board that auto-adjusts crews and timelines when projects change. |
Assign Crew | Action used to designate team members to a project within the calendar. |
Updated on: 10/10/2025
Thank you!